العربية

What we modeled after the SAIF poster

Three follow-up studies, all dated 21 November 2026. Each one is a computer model, recalculated independently. None is a measurement of a device.

Discovery is part of the product.

We start from physical principles, test ideas against independent calculations, keep every failure on record, and do not decide in advance which mechanism must win.

Research directions, not products:

  • Numerical model, independently recalculatedDeep donor atoms and isotope choices in silicon
  • Numerical model, independently recalculatedQuantum memory that survives reset and reuse
  • Numerical model, independently recalculatedControl, readout and calibration physics
  • Long-term goalOptical and acoustic links between chips
  • Long-term goalAlternative architectures and many-body physics

The poster's open question

The poster showed working software and separate models for selective control and for storing and returning a state. Could the same modeled system keep working on the state it had just produced?

  1. Numerical model, independently recalculated

    Study G3

    A second operation in the same sequence

    What we did
    The model carries the state and its measurement record through readout and reset, then entangles, reads out and resets a second time, in 6.210 µs of modeled time.
    Why it matters
    Shows the modeled system can keep working on the state it produced, not just run once.
    Limits
    A conditional model. The guarded quality estimate of 0.99997475 describes that complete modeled channel under its assumptions; it is not a measured gate. Two operations are not sustained throughput.
    Next opportunity
    Longer workloads, and a check that the computation itself was correct.
  2. Numerical model, independently recalculated

    Study G4

    A near-perfect score can hide a missing gate

    What we did
    We removed the entangling gate on purpose. The final readout and reset still looked almost perfect. A phase-sensitive readout, set up before it saw either run, told the two cases apart clearly, and separate code reproduced the result.
    Why it matters
    From now on, every processor claim must pass a test that sees the computation, not just a clean reset.
    Limits
    Predicted readouts from a model, not experimental shots.
    Next opportunity
    Build the same check into the first physical measurements.
  3. Numerical model, independently recalculated

    Study G5

    One fixed workload, 512 rounds in simulation

    What we did
    With a short correction in every round, one fixed two-qubit workload stayed on target for every length tested, up to 512 rounds and about 387 µs of modeled time, with no measurement or reset in between. Without the correction it failed far sooner.
    Why it matters
    Repeated coherent operation is possible in our model when calibration is right.
    Limits
    One fixed workload, not arbitrary programs. Calibration is fragile: a small error breaks it early. No protection against a nearby disturbance was shown for long runs.
    Next opportunity
    Calibration with real uncertainty, then the same test on measured hardware.

Evidence matrix

For judges: each claim, how it was obtained, how it was checked, what failed, and what tests it next.

ClaimMethodCheckFailure kept on recordNext test
ERDA: equal sensitivity scores, 100% vs 50% accuracySoftware experiment, synthetic classification task, 32 random seedsSoftware test; no independent reproduction claimedThe 50% encoding is reported, not hiddenRepeat on institution-held data, with permission
Runtime rejects a hidden phase errorImplemented software, 186 automated tests, offlineRecorded demonstration; tests rerun offlineReal-chip requests are reported unavailableRun against an independently measured control signal
G3: a second operation in 6.210 µs of modeled timeConditional numerical modelSeparate code recomputed the channelCovers one modeled channel, not a measured gateLonger workloads and checks on the computation
G4: a near-perfect reset score can hide a missing gateNumerical model with the gate deliberately omittedSeparate code reproduced the resultThe omitted-gate case is the findingBuild the same check into the first physical measurements
G5: one fixed workload, 512 rounds, about 387 µs modeledNumerical model with a short correction each roundSeparate code recomputed every tested lengthWithout correction it failed early; small calibration errors break itCalibration with real uncertainty, then hardware
AMAD: disguised payments escaped 96% (XGBoost), 33% (initial quantum model) and 10% (ERDA)Team benchmark on a public card-transaction dataset split to simulate separate banksTeam-reported; not independently reproduced; not bank dataThe initial quantum model let a third of disguised attempts throughRepeat on institution-held data, with permission

Where the evidence stands

  1. Implemented softwareDone

    SovereignQ software runs offline and caught a deliberately injected phase error.

  2. Numerical model, independently recalculatedDone

    Three follow-up studies, with every failed case kept on record.

  3. Independent reproductionDone

    Separate code recomputed the key results. This checks the calculations, not the physical assumptions.

  4. Physical electrical measurementNot yet

    The control bench has not yet recorded a qualifying measurement.

  5. Fabricated quantum hardwareNot yet

    No processor has been built. The package and test-coupon designs are proposals.

What has not been demonstrated

  • A manufactured quantum processor or its performance
  • Any quantum shots on real hardware
  • A qualified electrical control measurement
  • Scaling and manufacturing

The next gate: measure the control signal

Record the control bench independently, inject a known fault, show that it is caught and corrected, then measure again. That is the first step from simulation to hardware.

For researchers

How the studies are built
Each study is a numerical model with its assumptions stated, recalculated by separate code, with failed cases kept on record.
What the labels mean
A model result is never presented as a device measurement. The five evidence labels are explained on the Evidence page.
Where the references are
Scientific references on silicon donors, control and evidence are in folder 02 of our public evidence folder.
Going deeper
Technical detail beyond this page is shared on request after review. Speak with the team at the SAIF booth.

Could a quantum gate be missing while the readout still looks correct?

Pick what happened inside the processor, then look at the result two ways.

Intended operation

Entangling gate

Final reading

Not run yet

Looks successful

Phase-sensitive test

Not run yet

Passes

Gate omitted

Gate missing

Final reading

Not run yet

Looks successful

Phase-sensitive test

Not run yet

Fails

An educational explanation of a result from our numerical models (G4). Not a live quantum processor or a measured device; no method details or G4 numbers are shown.