Intended operation
Final reading
Not run yet
Looks successful
Phase-sensitive test
Not run yet
Passes
Three follow-up studies, all dated 21 November 2026. Each one is a computer model, recalculated independently. None is a measurement of a device.
We start from physical principles, test ideas against independent calculations, keep every failure on record, and do not decide in advance which mechanism must win.
Research directions, not products:
The poster showed working software and separate models for selective control and for storing and returning a state. Could the same modeled system keep working on the state it had just produced?
Study G3
Study G4
Study G5
For judges: each claim, how it was obtained, how it was checked, what failed, and what tests it next.
| Claim | Method | Check | Failure kept on record | Next test |
|---|---|---|---|---|
| ERDA: equal sensitivity scores, 100% vs 50% accuracy | Software experiment, synthetic classification task, 32 random seeds | Software test; no independent reproduction claimed | The 50% encoding is reported, not hidden | Repeat on institution-held data, with permission |
| Runtime rejects a hidden phase error | Implemented software, 186 automated tests, offline | Recorded demonstration; tests rerun offline | Real-chip requests are reported unavailable | Run against an independently measured control signal |
| G3: a second operation in 6.210 µs of modeled time | Conditional numerical model | Separate code recomputed the channel | Covers one modeled channel, not a measured gate | Longer workloads and checks on the computation |
| G4: a near-perfect reset score can hide a missing gate | Numerical model with the gate deliberately omitted | Separate code reproduced the result | The omitted-gate case is the finding | Build the same check into the first physical measurements |
| G5: one fixed workload, 512 rounds, about 387 µs modeled | Numerical model with a short correction each round | Separate code recomputed every tested length | Without correction it failed early; small calibration errors break it | Calibration with real uncertainty, then hardware |
| AMAD: disguised payments escaped 96% (XGBoost), 33% (initial quantum model) and 10% (ERDA) | Team benchmark on a public card-transaction dataset split to simulate separate banks | Team-reported; not independently reproduced; not bank data | The initial quantum model let a third of disguised attempts through | Repeat on institution-held data, with permission |
SovereignQ software runs offline and caught a deliberately injected phase error.
Three follow-up studies, with every failed case kept on record.
Separate code recomputed the key results. This checks the calculations, not the physical assumptions.
The control bench has not yet recorded a qualifying measurement.
No processor has been built. The package and test-coupon designs are proposals.
Pick what happened inside the processor, then look at the result two ways.
Final reading
Not run yet
Looks successful
Phase-sensitive test
Not run yet
Passes
Final reading
Not run yet
Looks successful
Phase-sensitive test
Not run yet
Fails
Both final readings look successful. Counting outcomes alone cannot tell the two runs apart.
Now they separate. The intended operation passes; the run with the missing gate fails.
An educational explanation of a result from our numerical models (G4). Not a live quantum processor or a measured device; no method details or G4 numbers are shown.