Next physical test
Controls Saudi engineers can qualify
Deliver a known electrical signal, capture it independently, introduce a fault and verify the corrected return. A qualifying bench acquisition is still ahead.
Processor console
Our software shapes the processor. Workloads from FQKL, ERDA and QuantumTwin decide what the chip must do, and control, memory and readout are designed to match. Our software checks each modeled result. Nothing shown here has been fabricated.
Follow one job from software to silicon and back in four stops. Each stop is a separate experiment or design; running the whole path on a SovereignQ chip is still a goal.
AMAD Fintech Hackathon · July 2026
ERDA tested whether a detector could recognize a disguised transaction. FQKL let the team explore learning across banks. QuantumTwin addressed laundering patterns over time. The pitch also set out human review and a three-bank evaluation (proposed, not agreed).
Read the AMAD storyRecorded software test · shown on the SAIF poster
In a test on a simulated device, the team introduced an error that counting outcomes alone would miss. The software also checked the quantum phase, which can change the answer to a later calculation.
Watch both runs in 72 secondsResearch progress · 21 November 2026
The submitted poster described separate tests of control and memory. The G3 follow-up model carried the first operation’s state and readout record into a second operation and reset. That makes reuse a question the team can test.
View the submitted posterTwo modeled services
6.210 µsModeled time from loading to the second reset
An independent reviewer recomposed the saved operations and checked the channel metrics. Preparation, detector response and feedback timing still need physical tests.
Read the G3 result and its assumptionsTechnical detail for scientists and engineers. Choose a view, then inspect a requirement or compare a recorded control study. The three archived cases use a separate donor model; their values are model outputs, not measurements.
The 20 November designs isolate electrode and sensor access on A and radio-frequency routing on B. They are shown side by side at illustrative scale. A complete physical assembly still needs qualification.
Dimensionless model comparison
Smaller values indicate a closer match in this model.
Next physical test
Deliver a known electrical signal, capture it independently, introduce a fault and verify the corrected return. A qualifying bench acquisition is still ahead.
Conditional 2030 target
A host submits a job, a silicon device performs a measured operation, and the host verifies the returned record. That requires fabrication, calibrated controls and readout on the same device.
Beyond the demonstrator
A memory must preserve phase through storage and retrieval. An accelerator must help a measured workload. Linked processors must exchange a state through a qualified interface. Each is a separate engineering milestone.